The Final Product
Construction was completed in October. We opened to the public on December 5th, 2009. The signs and other miscellaneous final touches continued over the following few months.
First the outside of the building...
 |
At left, the front of our building, 3690 Forest Park Ave. following construction and installation of our signage...
Below left, our incredible looking sign, designed by Doug Sattazahn of Real World Media Works and built by the craftsmen at Image Technologies Corporation...
Below right, the back of our building, featuring a newly paved lot with free parking. |
|
 |
Next, Old Plant No. 1 Pub; a dramatic change from pre-construction.
And last but not least, the brewhouse and cellar...
 |
At left, the brewhouse on our first production weekend...
Below left, the cellar and our fermenters...
Below right, the walk-in cooler and our bright beer tanks. |
 |
 |
|